KIPUSHI, DEMOCRATIC REPUBLIC OF CONGO – Ivanhoe Mines (TSX: IVN; OTCQX: IVPAF) announced today that the company has filed a new National Instrument 43-101 (NI 43-101) technical report covering the planned resumption of commercial production at the Kipushi Mine in the Democratic Republic of Congo.
The updated NI 43-101 technical report includes an independent feasibility study (Kipushi 2022 Feasibility Study) for the redevelopment of the Kipushi Mine and the mining of Kipushi’s zinc-rich Big Zinc and Southern Zinc zones, with an estimated 11.8 million tonnes of Measured and Indicated Mineral Resources grading 35.3% zinc.
The Kipushi 2022 Feasibility Study was independently prepared on a 100%-project basis by OreWin Pty. Ltd., MSA Group (Pty.) Ltd., SRK Consulting (Pty) Ltd. and METC Engineering.
The technical report titled “Kipushi 2022 Feasibility Study Technical Report” has been filed on the SEDAR website at www.sedar.com and on the Ivanhoe Mines website at www.ivanhoemines.com.
Information contacts
Investors: Bill Trenaman +1.604.331.9834 / Media: Matthew Keevil +1.604. 558.1034
刚果民主共和国基普什——艾芬豪矿业公司(TSX:IVN;OTCQX:IVPAF)今天宣布,该公司已提交了一份涵盖刚果民主共和国基普什项目恢复商业生产情况的加拿大矿产项目披露标准43‐101 (以下简称 “NI 43-101”) 最新技术报告。
更新后的NI 43-101技术报告包括一项独立的可行性研究(以下简称“基普什2022可行性研究”),用于基普什矿的再开发和基普什富锌大锌区和南锌区的开采,估计有1,180万吨测量和指示矿产资源,锌品位为35.3%。
基普什2022可行性研究由OreWin Pty. Ltd., MSA Group (Pty.) Ltd., SRK Consulting (Pty) Ltd. 和 METC Engineering 公司在100%项目基础上独立编制。
标题为“基普什 2022可行性研究技术报告”的技术报告已提交至SEDAR网站www.sedar.com和艾芬豪矿业公司网站www.ivanhoemines.com
联系方式
投资者﹕比尔·特伦曼 (Bill Trenaman),电话﹕+1.604.331.9834 / 媒体﹕马修·基维尔 (Matthew Keevil),电话﹕ +1.604.558.1034