VANCOUVER, CANADA — Ivanhoe Mines (TSX: IVN) today announced that, further to its news release dated February 23, 2016, the company has filed a National Instrument 43-101 technical report on the independent pre-feasibility study (PFS) for the first phase of mine development of the Kamoa Copper Project in the Democratic Republic of Congo. Kamoa is a joint venture between Ivanhoe Mines and Zijin Mining Group Co., Ltd.
The Kamoa 2016 PFS was independently prepared by OreWin Pty Ltd., Amec Foster Wheeler E&C Services Inc. and SRK Consulting Inc. in accordance with the 2014 CIM definition standards, incorporated by reference into Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The NI 43-101 technical report – titled Kamoa 2016 Pre-Feasibility Study – has been filed on the SEDAR website at www.sedar.com and on the Ivanhoe Mines website at www.ivanhoemines.com.
Information contacts
Investors
Bill Trenaman +1.604.331.9834
Media
North America: Bob Williamson +1.604.512.4856
South Africa: Jeremy Michaels +27.82.939.4812
Website www.ivanhoemines.com